Enter the dimensions of each slab, beam, footing, column or wall. Add as many items as your pour has, and we will total the cubic metres — then send the whole list to us in one tap.
Suggested order quantity, including wastage
The figure above is an estimate from the dimensions you entered. Reinforcement displacement, formwork tolerance and site levels all change the real requirement — confirm the final quantity with us before the pour.
Shuttering is rarely exactly to plan. Take the dimensions off the shuttering as it stands on site, and check slab levels at more than one point.
Spillage, pump priming, uneven subgrade and over-excavation all consume concrete. Most site engineers add 5 to 10 per cent, and a short load costs far more time than a small surplus.
Grade is a structural decision, not a price decision. Send us the drawing and we will recommend a mix design for your loading and exposure conditions.
Send us the grade, volume and date and we will confirm availability and mix design, usually the same day.